With the addition of the new center and main channel speakers, plus the BIC subwoofer, the home theater is pretty much all set. There’s a small bit of patching and some ceiling painting that is still needed, but everything else is wrapped up.
It wasn’t a small project, but I’m very happy with the results. Now, on to the rest of the basement. There’s a lot of painting needed, and some chair rail, but I think the next project will be finally setting up a MAME arcade machine. That’s step 2 in Project Man-Cave.